Tuesday, July 20, 2010

Don't Be a Stranger


While virtual meetings are convenient and reduce costs, we like to see you in person, too. Stop by the NFRC exhibit booth this summer or fall if you’re attending any of the following conferences:

Green Building Focus Conference & Expo, Aug. 25-26, in Birmingham, AL
GlassBuild America, Sept. 14-17, in Las Vegas
Greenbuild 2010, Nov. 16-19, in Chicago

And, don’t miss the (in-person) NFRC Fall 2010 Membership Meeting in San Francisco, scheduled for November 8-11.

Considerable Discussion Regarding NFRC 100A and NFRC 200A During Technical Committee Block

A number of proposed changes to both the NFRC 100A and the NFRC 200A resulted in considerable discussion during this afternoon’s Technical Committee block.

After lengthy discussion on the NFRC 100A ballot, "Procedure for Determining Fenestration Attachment Product U-factors," the Attachment Subcommittee sent the ballot back to task group with nearly a dozen persuasive and substantive negatives to address.

The Attachment Subcommittee then turned its attention to the NFRC 200A ballot, "Procedure for Determining Fenestration Attachment Product Solar Heat Gain Coefficient and Visible Transmittance at Normal Incidence." After reviewing the ballot comments, the subcommittee sent it back to task group.

Schedule Adjustment for Virtual Meeting

Please note: There is a small schedule change to the NFRC virtual meeting. The Ratings Committee will meet at 4 p.m. EDT today. Fifteen minutes after the Ratings block is over, the Technical Committee will re-convene to finish its business.

Day 2 of Virtual Meeting Starts with Software Subcommittee Meeting

The second day of NFRC’s Summer 2010 Virtual Committee Week kicked off with the Software Subcommittee meeting under the Technical Committee Block.

After Subcommittee Chair Brian Crooks, of Cardinal Glass Industries, Inc., welcomed participants, Joe Hayden, of Pella Corp., presented a motion on behalf of the WINDOW 6/THERM 6 Approval Task Group for an interim, partial approval of W6/T6.


The subcommittee passed a motion to approve the task group’s recommendation, as indicated in a June 1, 2010, letter to the NFRC membership. The letter noted that the “primary reason for this proposal is compatibility with the Component Modeling Approach (CMA) Software Tool, to avoid maintaining two different version of the WINDOW/THERM software.”


The task group’s proposal to partially implement W6/T6, and subsequently sunset W5/T5 on December 31, 2010, applies to simulation of only those products that can currently be simulated with W5/T5, in accordance with current NFRC procedures. The task group’s proposal also requires web-based training for certified simulators and IAs in August and September 2010 (and that no simulator shall use W6/T6 for NFRC certification services until they have successfully completed the training).


The motion, which applies to version 6.3 for both software programs, now moves forward to the Technical Committee for further consideration.

Monday, July 19, 2010

Technical Committee Discusses U-factor, SHGC Ballots

The Technical Committee block began today with the Air Leakage, U-factor, and Solar Heat Gain Subcommittees meeting to bring the first day of NFRC’s Virtual Committee Week Meeting to a close.

Air Leakage Subcommittee

The Air Leakage Subcommittee reported that it has nothing active for the moment.

U-factor Subcommittee Considers Three Ballots

NFRC 100 Garage Door Ballot. This ballot is intended to delete language addressing specimen panel number and height requirements in Section 5.5.1 A. In many cases, manufacturers seeking U-factor ratings in accordance with NFRC 100 are not tooled to produce 21”height sections for some door models and also may not use a four-panel configuration. Therefore, the standard should only require that the specimen fill a 7’ by 7’ opening.

After some discussion considering the specifics of the wording, a motion from Mike Thoman to move the language as balloted forward for approval passed unanimously.

NFRC 100 Sash Kit Ballot. This ballot is intended to revise the language regarding sash kits of any operator type. The intent of Option two of Section 5.1.2 in NFRC 100 is to allow the manufacturer of a sash kit of any operator type to use their existing whole product line rating if the sash in the kit and the product line are identical in material and design. Therefore, this ballot is presented to clarify this intent in NFRC 100.

One negative that arose was that the ballot contains certification language that does not belong in the technical document. Mike Thoman said a task group will be formed to revise the language and present a revised document at a later date. All associated negatives will be shared with task group.

NFRC 100 Table 4-3 Wall and Sloped Glazing Ballot. The intent of this ballot is to revise Table 4-3 of NFRC 100 for Curtain Wall, Window Wall, and Sloped Glazing. Table 4-3 is being balloted to remove the product type “glazed wall” because the term is not used consistently with the rating applied to curtain walls and window walls.

A motion to move the language forward as balloted was approved with no negatives or comments.

Solar Heat Gain Subcommittee

The Solar Heat Gain Subcommittee discussed three ballots.

NFRC 100 Garage (Vehicular Access) Doors. This ballot is intended to delete language addressing specimen panel number and height requirements in Section 5.5.1 A.

One negative asked to consider adding the following language to the section: “In accordance with U-factor validation testing to NFRC 100 for simulated garage door products, sectional garage doors shall have the SHGC determined based on a specimen filling 2.13 (7’) wide by 2.13 (7’) tall opening (the aperture is smaller than the test specimen). Panel sizes and construction shall be in accordance with manufacturers normal specifications for a door of these dimensions.”

A motion to move the NFRC 200 garage door ballot forward to the Technical Committee for approval and implementation upon publication passed.

NFRC 200 Section 4.5.G Laminates. This ballot is intended to clarify language in NFRC 200-2010, Section 4.5, as it relates to laminated glazing in the matrix of center-of-glazing SHGC/VT options.

One negative focused on the verbiage, “ratings for products with obscured, frit, or wired glass and/or stained glass shall be deemed to be equivalent to the ratings for the clear glass” and whether it should be deleted in its entirety since Window 6 can model these variations to provide more accurate VT ratings. Following some discussion, the crux of the issue here focused on whether the word “frit” should be removed.

The negative was ultimately withdrawn, and a motion to move the 200 Section 4.5.G to the Technical Committee and to be implemented upon publication passed 15 – 9.

The final ballot in this block involved a revised draft of NFRC 201, which adds the capability to measure the SHGC of Tubular Daylighting Devices (TDD) in solar calorimeters.

Previously, the NFRC Technical Interpretation Number, TI-2003-22, has been used to specivy how to measure the SHGC of TDDs using NFRC 201. After refinement by the TDD SHGC Testing Group, the intent of the previous NFRC Technical Interpretation has been incorporated into the document and into a new Annex G. Only the sections of 201that were revised are included.

One of the negatives presented was that the incident light needs to be more accurately assessed to avoid significantly overstating the resulting SHGC. A motion to find this negative persuasive and substantive and return it to Task Group passed.

Technical Committee Resumes Tomorrow

The Technical Committee Block will resume at 11:00 a.m. (EDT) tomorrow, Tuesday, July 20, 2010 and run until 2:00 p.m. The Software, Condensation Resistance, Annual Energy Performance, Attachment, and CMA Subcommittees are scheduled to meet.

Research & Technology Committee Passes Four Motions

The first day of NFRC’s virtual meeting approached its mid-point with the Research and Technology Committee passing four motions.

After Committee Chair Werner Lichtenberger, of Truseal Technologies, opened the meeting, Bipin Shah, of WinBuild, Inc., presented three motions on behalf of the Research Subcommittee.

The committee passed motions to extend the deadlines for the Windows6/THERM6 research project and t
he complex visible transmittance (VT) research project to the Fall 2010 Membership Meeting, and approved the new scope for the NFRC Ventilation Rating Task Group.

The committee then heard reports from Sneh Kumar, of Traco, on the activities of the Optical Properties Subcommittee, and Charlie Curcjia, of CARLI, Inc., on the Thermophysical Properties Subcommittee meeting from earlier in the day.

The committee concluded its business with the day’s first unanimous vote – to dissolve the NFRC 600 Glossary Task Group.

Thermophysical Property Subcommittee Convenes

The Thermophysical Property of Materials Subcommittee met this afternoon during Virtual Committee Week. Subcommittee Chair Charlie Curcija, of Carli, Inc., welcomed participants.

Ray McGowan, NFRC senior program manager, reported on thermophysical property submissions. He noted that 14 new materials have been submitted since the NFRC Spring Membership Meeting. The updated NFRC 101 is expected to be released next week.


McGowan continued the meeting by providing an update on the Thermophysical Properties Interlaboratory Comparison (ILC). This is the first ILC for thermophysical properties that NFRC has ever conducted.


The testing, involving combinations of composite board, is complete, and the preliminary results are quite good, McGowan reported. The full report will be available at the NFRC Fall 2010 Membership Meeting.


In other subcommittee news, NFRC 101/103 has been disbanded. Also, Curcija reported that the subcommittee had been directed to develop an electronic version of NFRC 101 Appendix A and to provide that as a THERM library file. (The subcommittee will be proceeding with a similar version for NFRC 101 Appendix B as well). The subcommittee then formed a task group to review Appendix A and Appendix B, and it is seeking a volunteer to chair this new task group.